Ex Post Risk Management in Public-Private Partnership Infrastructure Projects
PA
PERS
Engel, E., Fischer, R., & Galetovic, A.
(2009). Soft budgets and renegotiations
in public-private partnerships. National
Bureau of Economic Research.
Guasch, L. (2004). Granting and
renegotiating infrastructure concessions:
Doing it right. Washington, DC: World
Bank.
Hart, O. (2003). Incomplete contracts
and public ownership: Remarks,
and an application to public-private
partnerships. The Economic Journal,
113(486), C69–C76.
Hart, O., & Moore, J. (1988).
Incomplete contracts and renegotiation.
Econometrica: Journal of the Econometric
Society, 56( 4), 755–785.
Hart, O., Shleifer, A., & Vishny, R. W.
(1997). The proper scope of government:
Theory and an application to prisons.
The Quarterly Journal of Economics,
112( 4), 1127–1161.
HM Treasury. (2007). Standardisation of
PFI contracts (SoPC) Version 4. Retrieved
from http://www.hm-treasury.gov.uk/d/
pfi_sopc4pu101_210307.pdf.
Hwang, B. G., Zhao, X., & Gay, M. J. S.
(2013). Public private partnership
projects in Singapore: Factors, critical risks
and preferred risk allocation from the
perspective of contractors. International
Journal of Project Management, 31( 3),
424–433.
Hwang, B. G., Zhao, X., Yi, L. S., &
Zhong, Y. (2015). Addressing risks
in green retrofit projects: The case of
Singapore. Project Management Journal,
46( 4), 76–89.
Iossa, E., & Martimort, D. (2016).
Corruption in PPPs, incentives and
contract incompleteness. International
Journal of Industrial Organization, 44(C),
85–100.
Jin, X. H. (2010). Neurofuzzy decision
support system for efficient risk
allocation in public-private partnership
infrastructure projects. Journal of
Computing in Civil Engineering, 24( 6),
525–538.
Ke, Y. J., Wang, S. Q., Chan, A. P. C.,
& Lam, P. T. I. (2010). Preferred risk
allocation in China’s public–private
partnership (PPP) projects. International
Journal of Project Management, 28( 5),
482–492.
Ke, Y. J., Wang, S. Q., & Chan, A. P.
C. (2010). Risk allocation in public-private partnership infrastructure
projects: Comparative study. Journal of
Infrastructure Systems, 16( 4), 343–351.
Kerf, M. (1998). Concessions for
infrastructure: A guide to their design and
award. World Bank Publications.
Kwak, Y. H., & LaPlace, K. S. (2005).
Examining risk tolerance in project-driven organization. Technovation, 25( 6),
691–695.
Li, B., Akintoye, A., Edwards, P. J., &
Hardcastle, C. (2005). The allocation of
risk in PPP/PFI construction projects in
the UK. International Journal of Project
Management, 23( 1), 25–35.
Loo, B. P. Y. (2003). Tunnel traffic and
toll elasticities in Hong Kong: Some
recent evidence for international
comparisons. Environment and Planning
A, 35( 2), 249–276.
Marques, R. C., & Berg, S. (2011).
Risks, contracts, and private-sector
participation in infrastructure. Journal
of Construction Engineering and
Management, 137( 11), 925–932.
Matas, A., & Raymond, J. L. (2003).
Demand elasticity on tolled motorways.
Journal of Transportation and Statistics,
6( 2), 91–108.
Medda, F. (2007). A game theory approach
for the allocation of risks in transport public
private partnerships. International Journal
of Project Management, 25( 3), 213–218.
Newell, M. W., & Grashina, M. N. (2004).
The project management question and
answer book. New York, NY: Amacom
Books.
Pantelias, A., & Zhang, Z. (2010).
Methodological framework for evaluation
of financial viability of public-private
partnerships: Investment risk approach.
Journal of Infrastructure Systems, 16( 4),
241–250.
Parker, D., & Handmer, J. (2013). Hazard
management and emergency planning:
Perspectives in Britain. London, England:
Routledge.
Project Management Institute. (2000). A
guide to the project management body of
knowledge (PMBOK® guide). Drexel Hill,
PA: Author.
Ropeik, D., & Gray, G. M. (2002). Risk:
A practical guide for deciding what’s
really safe and what’s really dangerous
in the world around you. Boston, MA:
Houghton Mifflin Harcourt.
Roumboutsos, A., & Anagnostopoulos,
K. P. (2008). Public–private partnership
projects in Greece: Risk ranking and
preferred risk allocation. Construction
Management and Economics, 26( 7),
751–763.
Shan, L., Garvin, M. J., & Kumar, R.
(2010). Collar options to manage
revenue risks in real toll public-private
partnership transportation projects.
Construction Management and
Economics, 28( 10), 1057–1069.
Shen, L. Y., Li, H., & Li, Q. M. (2002).
Alternative concession model for build
operate transfer contract projects.
Journal of Construction Engineering and
Management, 128( 4), 326–330.
Tirole, J. (1988). The theory of industrial
organization. Cambridge, MA: The MIT
Press.
Vassallo, J. M., Ortega, A., & de los
Ángeles Baeza, M. (2011). The impact
of the economic recession on toll
highway concessions in Spain. Journal
of Management in Engineering, 28( 4),
398–406.
Wang, S. Q., Tiong, R. L. K., Ting, S. K.,
& Ashley, D. (2000). Evaluation and
management of political risks in China’s
BOT projects. Journal of Construction
Engineering and Management, 126( 3),
242–250.
Wibowo, A., & Kochendörfer, B.
(2005). Financial risk analysis of project
finance in Indonesian toll roads.
Journal of Construction Engineering and
Management, 131( 9), 963–972.
Wilbur Smith Associates Limited.
(2011). Consultancy services for providing
expert advice on rationalising the