Alfalla-Luque, R., Medina-Lopez, C.,
& Dey, P.K. (2013). Supply chain
integration framework using
literature review. Production Planning
& Control: The Management of
Operations 24( 8–9), 800–817. doi:
10.1080/09537287.2012.666870
Altshuler, A., & Luberoff, D. (2003).
Mega-projects: The changing politics of
urban public investment. Washington,
D.C.: Brookings Institution Press.
doi: 10.1007/S10901-005-9005-6
Amland, S. (2000). Risk-based testing:
Risk analysis fundamentals and metrics
for software testing including a financial
application case study. Journal of
Systems and Software, 53( 3), 287–295.
doi: 10.1016/S0164-1212(00)00019-4
Atkinson, R., Crawford, L., & Ward, S.
(2006). Fundamental uncertainties
in projects and the scope of project
management. International Journal of
Project Management, 24( 8), 687–698.
doi: 10.1016/j.ijproman.2006.09.011
Ayyub, B. M., Prassinos, P. G., & Etherton, J.
(2010). Risk-informed decision making.
Mechanical Engineering, 132( 1), 28–33.
Bedi, H. P. (2013). Environmental
mis-sssessment, development and
mining in Orissa, India. Development
and Change, 44( 1), 101–123. doi: 10.1111/
dech.12000
Bender, W. J., & Ayyub, B. M. (2001).
Risk-based cost control for construction.
AACE International Transactions,
Morgantown, United States, 1. 1-9
Bing, L., Akintoye, A., Edwards, P. J., &
Hardcastle, C. (2005). The allocation of
risk in PPP/PFI construction projects in
the UK. International Journal of Project
Management, 23( 1), 25–35. doi: 10.1016/
j.ijproman.2004.04.006.
Botetzagias, I., Malesios, C.,
Kolokotroni, A., & Moysiadis, Y. (2013).
The role of NIMBY in opposing the siting
of wind farms: Evidence from Greece.
Journal of Environmental Planning and
Management, 58( 2), 229–251. doi: 10.1080
/09640568.2013.851596
Bradshaw, G. B. (2008). Establishing a
first class project controls organization
for managing large complex projects.
AACE International Transactions,
Toronto, Canada, 1–9.
Brady, T., & Davies, A. (2010). From
hero to hubris: Reconsidering the
project management of Heathrow’s
Terminal 5. International Journal of
Project Management, 28( 2), 151–157.
doi: 10.1016/j.ijproman.2009.11.011
Brady, T., & Davies, A. (2014). Managing
structural and dynamic complexity: A
tale of two projects. Project Management
Journal, 45( 4), 21–38. doi: 10.1002/
pmj.21434
Bruzelius, N., Flyvbjerg, B., &
Rothengatter, W. (2002). Big decisions,
big risks: Improving accountability
in mega projects. Transport Policy,
9( 2), 143–154. doi: 10.1016/S0967-
070X(02)00014-8
Buchan, D. H. (1994). Risk analysis—
some practical suggestions. Cost
Engineering, 36( 1), 29–34.
Burcar, I., Radujkovic´, M., &
Vukomanovic´, M. (2013). Risk register
development and implementation for
construction projects. Gradevinar, 65( 1),
23–35.
Cates, G. R., & Mollaghasemi, M.
(2007). The project assessment by
simulation technique. EMJ—Engineering
Management Journal, 19( 4), 3–10. doi: 10.
1080/10429247.2007.11431743
Chapman, C. B., & Ward, S. (2003).
Project risk management: Processes,
techniques and insights (2nd Ed.).
Chichester, UK: Wiley.
Chen, D., Qiu, W., Yang, M., & Mei-yung,
L. (2007). Activity flow optimization
and risk evaluation of complex project.
2007 International Conference on
Wireless Communications, Networking
and Mobile Computing, WiCOM 2007,
Shanghai, China, 5191-5194. doi: 10.1109/
WICOM.2007.1272
Chen, S. M., & Chang, T. H. (2001).
Finding multiple possible critical paths
using fuzzy PERT. IEEE Transactions
on Systems Man and Cybernetics
Part B-Cybernetics, 31( 6), 930–937.
doi: 10.1109/3477.969496
Clegg, S. R., Pitsis, T. S., Rura-
Polley, T., & Marosszeky, M. (2002).
Governmentality matters: Designing an
alliance culture of inter-organizational
collaboration for managing projects.
Organization Studies, 23( 3), 317–337.
doi: 10.1177/0170840602233001
Cooper, D. F., & Chapman, C. B. (1987).
Risk analysis for large projects: Models,
methods, and cases (1st Ed.). Hoboken,
NJ: Wiley.
Cooper, D. F., Grey, S., Raymond, G.,
& Walker, P. (2004). Project risk
management guidelines: Managing risk in
large projects and complex procurements.
Chichester, UK: Wiley.
Cooper, R. G., Edgett, S. J., &
Kleinschmidt, E. J. (2001). Portfolio
management for new products.
Cambridge, MA: Da Capo Press.
Courtot, H. (2001). Communication des
risques dans les projets. Communication
et Organisation, 20, 49–60.
Creedy, G. D., Skitmore, M., & Wong, J.
K. W. (2010). Evaluation of risk factors
leading to cost overrun in delivery
of highway construction projects.
Journal of Construction Engineering
and Management, 136( 5), 528–537.
doi: 10.1061/(ASCE)CO
.1943-7862.0000160
Cronin, P., Ryan, F., & Coughlan, M.
(2008). Undertaking a literature review:
A step-by-step approach. British Journal
of Nursing, 17( 1), 38–43.
Davies, A., Gann, D., & Douglas, T.
(2009). Innovation in megaprojects:
Systems integration at London
Heathrow Terminal 5. California
Management Review, 51( 2), 101–125.
doi: 10.2307/41166482
De Palma, A., Picard, N., & Andrieu, L.
(2012). Risk in transport investments.
Networks & Spatial Economics, 12( 2),
187–204. doi: 10.1007/s11067-009-9109-8
De Sousa Júnior, W. C., & Reid, J. (2010).
Uncertainties in Amazon hydropower
development: Risk scenarios and
environmental issues around the Belo
Monte dam. Water Alternatives, 3( 2),
249–268.